Hobart OV500G1 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Four Hobart OV500G1. Hobart OV500G1 User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 2
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
ASSEMBLY & START-UP
SCOPE OF WORK GUIDE
SCOPE OF WORK
Standard installation charges are included in the original Bakery order and are released
at time of shipment. Some divisions have negotiated with Hobart to do additional
installation work. These services are on a division-by-deviation basis and are invoiced
locally to the division.
Hobart offices will be notified prior to shipment of bakery oven and proofer. It will include
the project manager’s name and phone number. The installing office should contact that
person to schedule installation.
After Hobart has equipment set in place, they should notify their Kroger contact that the
utilities are ready for connection. They should also arrange to be notified when utilities
are completed and Kroger is ready for Hobart to perform the start-up.
Any questions regarding orders, or ship dates should be directed to Karen DeHart in
Troy, OH. (937-332-2408).
KROGER/GENERAL CONTRACTOR RESPONSIBILITIES:
Receive, unload and store equipment within a reasonable working distance near the
final installation location
Apply for any local permits that may be required
Connect required utilities to equipment upon completion of equipment assembly
Supply Gas Regulator (Unit requires 11” Water Column)
Provide for removal of all debris from property. Hobart will remove debris from
installation site to dumpster location
Schedule equipment installation with local Hobart Service Office
OV500G1 SINGLE RACK OVEN GAS
OV500G2 DOUBLE RACK OVEN GAS
OV500E1 SINGLE RACK OVEN ELECTRIC
OV500E2 DOUBLE RACK OVEN ELECTRIC
Procedures and Scope of work for installing an OV500
Rack Oven.
For details, refer to the Owner/Operator manual or
Quick Reference Guide
Vue de la page 0
1 2

Résumé du contenu

Page 1 - SCOPE OF WORK GUIDE

ASSEMBLY & START-UP SCOPE OF WORK GUIDE SCOPE OF WORK Standard installation charges are included in the original Bakery order an

Page 2

INSTALLING HOBART OFFICE RESPONSIBILITIES: • Coordinate Assembly and Start up of Oven and Proofer (see details below) • Schedule installation and st

Modèles reliés OV500E1 | OV500G2 |

Commentaires sur ces manuels

Pas de commentaire